January 31, 2026 | Upton County | Midland Basin
CAMScout Compound Angle Mud Motor
CAMScout successfully completed an 8.5” hole on the longest consecutive run in our company’s history, saving three trips and reducing operating time by more than five days directly impacting cost, safety, and operational predictability.
Challenge
Demanding Midland Basin and complex navigation of densely stacked rock layers
Solution
7 1/8” 1.75° CAMScout
Results
Conclusion
Throughout the entire 21,298‑foot interval, CAMScout demonstrated exceptional stability and drilling efficiency. Including the curve interval, the motor maintained a low 7.7% sliding and produced 8% less dogleg severity resulting in a higher‑quality wellbore and improved long‑term production potential. In comparison with the closest offset in the same PAD and target formation the motor delivered higher ROP, saved 3 trips, 5 days, and drilled 21.2 ft farther.